Al Sonwan Hospital is designed to be a Gynecological and Orthopedic Hospital in Bengazi, Libya. The hospital is presently under development (01-2023).
The Owner of the Hospital Project discovered our company through previous references from other hospital managers and owners. This Project started when the Owner of the hospital requested Construction materials such as Doors, Handrails and floorings. After a couple of meetings with our architectural team, Our company also analyzed the hospital’s construction items and defined the features, such as anti-bacterial doors, Hermatic Doors, Handrails, and Anti-Bacterial Vinyl Flooring. Which were sent directly to Bengazi with a skilled crew to aid in the montage of those Products.
Our architectural and medical engineering team also discovered certain design errors after evaluating the facilities’ architectural and construction blueprints. The Sterilization chamber, and how the entrance and departure of sterilized and unsterile tools were the same, was one of the significant issues. A conference was held between hospital authorities and our team to present the best answer to the problem, which was applauded and accepted by the administrators.
The hospital is now completing construction, and our company is overseeing the process and assisting as needed.