– Country/City: Libya – Benghazi City -Field: Maternity and Gyn Hospital
– Project start date: 01.02.2022 – Finishing date: 01.07.2022
Supplies:
- Medical-grade doors meeting hospital specifications.
- Nurse call system.
- False ceilings with antibacterial properties for OR and ICU.
- Non-medical false ceilings.
- Handrails for corridors.
Services provided :
- Architectural redesign to connect the operating department with the CSSD sterilization department
- Hospital bedding and inventory of necessary requirements with visual identity-compatible suggestions and hospital logo integration on selected products
- Discussion and installation of specialized hospital door specifications
- Door manufacturing and production monitoring with ensured model and color matching
- Logistic consolidation of products and execution of a single 40HC container shipment to Benghazi city port
A quick overview of the project :
Al-Sanwan Maternity Hospital is an exceptional facility in its design and location, with a capacity of 45 beds, 3 operating rooms (OR), and intensive care units (ICU,NICU) It is also equipped with Libya’s first underwater delivery room.
In our commitment to complete transparency, despite communications between Eng. Bilal Aloulou, Director of YOSRA Trade-Medical Service Ltd. Co., and Dr. Mohamed El-Sheikhi (one of the hospital’s owner-partners), the delivered supplies were limited due to various reasons including:
• Interference from other project stakeholders/partners
• Shortcomings by Yosra’s team in door packaging during inspection
• Delays in receiving some maintenance materials
• Final resolution of shipping/installation issues being handled personally between Dr. Mohamed and the former company manager rather than directly with YOSRA Trade-Medical Service Ltd. Co.
As of the date of this announcement, the hospital remains under construction, and we wish them continued success.