Al-Rasheed hospital

About the project

– Country/City:  Libya – Tripoli  City                        -Field: Multidisciplinary Surgical
– Project start date:  01.09.2021                           – Finishing date:.01.11.2021

Supplies:

  • Medical furniture for some hospital departments.
  • Special equipment for the sterilization department.
  • Textile products customized with the hospital logo (bedsheets and staff uniforms).
  • Some of equipment for operating rooms, and stainless steel surgical/sterilization furniture.

Services provided :

  • Complete furnishing of the hospital and assessment of requirements, with design suggestions aligned with the hospital’s visual identity, including branding integration on selected items.
  • Consultation on the required medical equipment specifications and proposing the most suitable configurations. 
  • Full supervision of the manufacturing process and quality control to ensure compliance with the approved specifications.
  • Consolidation of products from multiple suppliers and arranging a single 40HC container shipment, delivered to Tripoli Port.

A quick overview of the project :

Al-Rasheed Hospital is a multi-specialty surgical hospital with a capacity of 90 beds and 4 operating rooms (OR). It includes a NICU department, a physical therapy department, and an emergency department (ER). It is considered one of the best hospitals specialized in orthopedic surgery.

Following a visit between Dr. Hussein Al-Rajbani, owner and director of Al-Rashid Hospital, and Eng. Bilal Aloulou, Director of YOSRA Trade-Medical Service Ltd. Co., several meetings and field visits were conducted to Turkish factories, most notably an operating table factory. YOSRA Trade-Medical Service Ltd. Co. successfully secured a specialized operating table for orthopedic surgery that can be raised to a maximum height of 120 cm as requested by the specialist surgeon. An agreement was reached with YOSRA Trade-Medical Service Ltd. Co. to execute the project.

YOSRA Trade-Medical Service Ltd. Co. supplied all hospital equipment, including medical devices, furniture, and operating room furnishings, in collaboration with more than 7 different Turkish companies, all within a period not exceeding 60 working days.

Other projects