Projects in Libya

Tujan Specialized Hospital

Year April 2021 – July 2021 Client Tujan Specialized Hospital Location Tripoli, Libya
— THE PROJECT

Turnkey furnishing and equipment for a 60-bed multidisciplinary surgical hospital in Tripoli — delivered in under three months.

What we delivered

  • Full furnishing of all hospital departments
  • 4 operating rooms equipped
  • ICU and NICU equipment
  • Sterilization unit and blood bank equipment
  • 5 x 40HC sea shipments to Tripoli Port

Supplies

  • Medical furniture for all hospital departments (inpatient care, OPD, ER, OT)
  • Operating room equipment, stainless steel furniture, and NICU devices
  • Unified office furniture matching the visual identity of the OPD and administrative departments
  • Automatic and specialized doors for ICU and OT departments
  • Cotton materials, uniforms, and antibacterial curtains
  • Sterilization and disinfectant materials for COVID-19 infection control
  • Surgical instruments and sterilization containers
  • Refrigerators, freezers, and blood bank equipment
  • Hospital food thermal trays and trolleys

Services Provided

  • Color coordination and standardized design across all medical and office furniture
  • Procurement of all required items within the allocated project budget
  • Direct supervision of manufacturing and final quality inspections against specifications
  • Scheduled sea shipments in organized batches (5 x 40HC containers) to Tripoli Port
  • Refurnishing of all departments with detailed requirement lists based on on-site measurements and floor plans

Project Videos

Video thumbnail
Video thumbnail
Video thumbnail
Video thumbnail
Video thumbnail

Other Facilities & Projects

Discover more turnkey medical and surgical facilities we've equipped.

View all projects →

Ready to Equip Your Hospital or Medical Facility?

From architectural planning to turnkey supply and supervision, our engineering team ensures world-class European standards.